Tuesday, 19 March 2019

Team Meeting Discussion No.4

30 minutes.

  Joe has completed all of his own pre-production assigned work: the storyboard (?), the characters profiles and the risk assessment.

  Kieravin has completed all of his own pre-production assigned work: cast and crew call sheet, the location report and the equipment lis and claims sheet.

  Katherine has completed all of her own pre-production assigned work: synopsis, production schedule and the shot log.

  Grace has completed all of her own pre-production assigned work: the script, the copyright release forms, pre-production plans and the program proposal.

Joe:

  • Check with everyone to make sure that all of our work has been posted to the blog.
  • Create a CV.
  • Go onto the blog and ready through everything so that you know what everyone else has done and put.
  • Make a digital version of the storyboard.
Kieravin:

  • Read through the location report.
  • Create a CV.
  • Go onto the blog and ready through everything so that you know what everyone else has done and put.

Katherine:

  • Read through CV and see if anything needs to be changed or added.
  • Go onto the blog and ready through everything so that you know what everyone else has done and put.
  • Help with creating the presentation for our pitch.
Grace:
  • Create a CV.
  • Continue with the presentation for our pitch.
  • Go onto the blog and ready through everything so that you know what everyone else has done and put.